Log in or Register for enhanced features | Forgotten Password?
White Papers | Suppliers | Events | Report Store | Companies | Dining Club | Videos

Power Generation
Hydro
Return to: EBR Home | Power Generation | Hydro

Poyry wins engineering services conract in Dzora hydropower plant of Armenia

Published 10 July 2017

Energy Invest Holding has awarded Poyry with the engineering and consultancy services assignment for the headworks rehabilitation project for the Dzora hydropower plant (HPP) in Armenia.

Dzora HPP was built on the Dzoraget river and has been operating since 1932.

Pöyry will prepare an inventory of the observed damages to the concrete structures and hydromechanical equipment, assess the reduced operability or the expectable durability of the hydro-scheme based on a risk analysis and clarify the geological/geotechnical potential causes for the damages in view of designing proper countermeasures.

"Delivering clean, renewable energy projects in this region further strengthens Pöyry's position as one of the world's leading hydropower engineering consultancies" says Richard Pinnock, President of Pöyry's Energy Business Group.

The value of the order is not disclosed. The order will be recognised within the Energy Business Group order stock in H1/2017.



Source: Company Press Release